Project Description:
Long-haul fiber backbone installation.
Scope:
- Install fiber between huts throughout central Kansas
- Established required permits through governmental entities
- Access right of ways along engineering designed route paths
- Use of multiple underground construction techniques including:
- Directional Drilling
- Long Row Trenching
- Vibratory Plowing
- Excavation and Backfill
- New fiber conduit installation along new route
- Handhole installations
- Fiber pulling through newly installed conduit